Here You can buy industrial heat exchangers in Chita for Your facility. For plate heat exchangers of our own production, we have established a factory price.
Since 2010, the supply of heat-exchange equipment:
Plate heat exchangers;
Brazed heat exchangers;
Welded heat exchangers;
Shell-and-plate heat exchangers;
Shell and tube heat exchangers.
For 7 years we have sold 2546 units. We supply products of reputable domestic and foreign manufacturers.
Russian producers: Ridan, Mashimpeks, ETRA, Rosvep, TIZH, Envitec, Telehit, teploteks, thermal control, Kelvin.
Foreign brands: Alfa Laval, SWEP (Sweden), Funke, GEA (Germany), Danfoss, Sondex (Denmark), ONDA (Italy), KAORI (Taiwan).
Qualified engineers carry out accurate calculation and proper selection of equipment in Chita for Your facility.
The boiler plant produces hot water and steam boilers, furnaces, gas, diesel and fuel oil boilers, modular boiler mku, fuel supply systems and slag removal, cyclones, draft machines and water treatment systems.
- modular boiler mku
- boilers on gas, on coal, on firewood, on the diesel, on fuel oil, with a productivity of 300 - 1000 kg/h, CP-300, CP-500, CP-700, CP-1000
- hot water boilers KV to 4.0 MW. Boiler KV 0,15, 0,2 KV, KV 0,3, 0,4 KV, 0,5 KV, KV 0,6 KV 0,8 KV 1,0 KV 1,1 KV 1,25 KV 1,4 KV 1,6, KV 2,0 KV 3,5 KV 4,0.
- boilers on gas, on diesel, on fuel oil – up to 4.0 MW
- boilers on firewood to 1.28 MW
- furnace TSPM, TSPM-0,8, TSPM-1,45, TSPM-1,5, TSPM-2,0, TSPM-2,5, spare parts and grate TSPM, spare parts of boiler Bratsk
- furnace TLPKH, spare parts and grate TLPKH
- furnace TLSM spare parts and grate TLPKH
- the mechanical Stoker ZP-400, ZP-600, DMC-400, PMZ-600. The spare parts of the Stoker.
- battery cyclones BC 2
- battery cyclones BC-259
- battery cyclones BC-512
- TSN 15 cyclones, TSN-15-300, TSN-15-400, TSN-15-500, TSN-15-600, TSN-15-700, TSN-15-800, TSN-15-900
- the cyclones TSN-11, TSN-11-300, TSN-11-400, TSN-11-500, TSN-11-600, TSN-11-700, TSN-11-800, TSN-11-900
- ash collectors ZU-1-1, ZU-1-2, ZU-1, ZU-2, ZU-2-1, ZU-2-2
housing element cyclone BC 2, BC exhaust pipe 2, element cyclone BC 259
- DN, DN 3,5, 6,3 days, 8 days, 9 days, 10 days, and 11.2 days, and 12.5 days
- the US fuel supply, ash removal, ash and slag removal USSH, conveyors TS-2-30 and TS-2-28
crusher TO-1M, VDP-15
- skip hoists boilers
- cast iron grate, furnace doors
- boiler automation, automation of boilers,