CONSTRUCTION, INSTALLATION AND FINISHING WORKS FOR APARTMENTS, OFFICES AND COTTAGES
№ p/p the name of the work Unit. izm. The cost of the work
Dismantling work.
1 Removal of old Wallpaper 70,0 m2
2 a Roll of plaster m2 150,0
3 blur, sweep ceiling m2 100,0
4 Dismantling of cement-sand screed 50 mm 150,0 m2
5 Dismantling of cement-sand screed 50 mm m2 200,0
6 removal of concrete floor up to 100 mm of 300.0 m2
7 Dismantling of the concrete floor from 100 m2 to 400 mm
8 Dismantling of the suspended ceiling construction m2 150,0
9 dismantling of the parquet,parquet Board m2 120,0
10 the Dismantling of the old floor MP. 50,0
11 Dismantling of old paint (walls) m2 150,0
12 removal of old paint (autoloc) m2 200,0
13 Dismantling doors of 300.0 EA.
15 Dismantling Windows PCs 300,0
16
Dismantling tiles from walls and floors
m2 150,0
17 Dismantling faucets 200,0 PCs.
18 Dismantling baths PCs 800,0
19 Dismantling bidet and toilet pieces of 300.0
20 the Dismantling of fans, water pipes MP. 200,0
21 Board dismantling pieces 1500,0
22 Dismantling of walls and partitions (penobloki,cinder blocks.brick) m2 500,0
23 Dismantling existing brick structures m3 2500,0
24 the Dismantling of reinforced concrete structures 4000,0 m2
Floors.
1 floor Primer in a single layer m2 50,0
2 Cement-sand screed thickness up to 50 mm m2 400,0
3 Cement-sand screed thickness of 50 mm to 70 mm. m2 500,0
4 Installation beacons m2 60,0
5, the reinforcement Device for coupling m2 70,0
6 Liquid (self-levelling mortar) with thickness up to 30 mm of 300.0 m2
7 waterproofing of the floor PVC film m2 100,0
8 Flooring plywood, or particle Board for the finished basis of 200.0 m2
10 Flooring parquet in finished ground 900,0 m2
11 the panel Board parquet Flooring (laminate) on the finished base. to 350.0 m2
12 Sanding/hardwood floor sanding. m2 500,0
13 Putty flooring m2 200,0
14 the Coating of parquet lacquer, 2 layers of 300.0 m2
15 linoleum Flooring, carpets m2 300,0
16 Installation of baseboard MP. 150,0
17 the Installation of the profile thresholds of the MP. 200,0
18 Painting the baseboards or trim MP. 150,0
19 installation of tiles 700,0 m2
20 setting the border and ceramic floor MP. 550,0
21 Grout seam m2 100,0
Wall.
1 Plaster up to 3 cm m2 450,0
2 Plaster 6 cm. m2 550,0
3 Primer of slopes m2 80,0
4 Plaster walls of plasterboard m2 300,0
5 Plaster textured walls for painting m2 300,0
6 Plaster walls to 350.0 m2
7 wall Painting on plastered walls m2 150,0
8 Plaster walls with the color (up to 400mm) M. p 400,0
9 Installation of the wall panels m2 450,0
10 wallpapering a fit picture of 300.0 m2
11 wall Cladding with ceramic tiles m2 800,0
12 Facing slopes,columns ceramic tiles 900,0 m2
13 Drilling holes in ceramic tile pieces 80,0
14 Grouting m2 80,0
15 making revision on a magnetic mount PCs 100,0
16 the Device of walls from gypsum Board to metal. frame m2 400,0
17 Device peregorodok of the GCR 600,0 m2
18 Insulation m2 120,0
19 Siding clapboard, paneling m2 400,0
20 Treatment of the corners of the room corners and layouts MP. 100,0
21 Sticker painting mesh m2 100,0
Windows
1 installation of standard Windows PCs 1500,0
2 Window slopes lining the GKL RM 300
3 Window apertures, internal plaster RM to 350.0
4 Putty slope RM 250
5 Installing drip tops (on prepared base) RM. 300
6 the color of the slope of the RM.
150
Door
1 Painting the door pieces 1000,0
2 install the door unit PCs 2500,0
3 assemble the door frame pieces 600,0
4 Mounting fixing strap (to 5 cm) of MP. 300,0
5 ready to Install arch 2500,0 PC.
6 Device the arched doorway drywall pieces 3000,0
7 inserting the lock pieces 500,0
8 Installation of casing MP. 150,0
The ceiling.
1 Plaster m2 500,0
2 Primer m2 50,0
3 Plaster (first coat) m2 250,0
4 Plaster (finishing layer) of 300.0 m2
5 Painting of 2 times m2 200,0
6 Device ceiling of plasterboard on metal. the frame 600,0 m2
7 Device ceiling of plasterboard on metal. frame 2 level (straight) m2 650,0
8 Device ceiling of plasterboard on metal. frame 2 level (curvilinear) m2 of 950.0
9 Insulation m2 120,0
10 Siding clapboard, paneling m2 400,0
11 Sticker painting mesh m2 50,0
12 the Device of suspended ceilings m2 400,0
Plumbing
1 faucet Installation 600,0 PCs.
2 Sinks (no mixer) PCs. 1000,0
3 Installation of sinks, PCs 1200,0
4 installing the sink PCs 1500,0
5 Installation of toilet pieces 1800,0
6 Installing a bidet 2000,0 pieces.
7 Installation of bath cast iron pieces 3300,0
8 Installation of steel bathtubs PCs 2800,0
9 Installation of bath plastic pieces 2500,0
10 installing a shower with connecting pieces 4000,0
11 install the towel warmer at the ready carts PCs 800,0
12 install the towel warmer electric pieces 1000,0
13 Installation of towel rails with the preparation of pipes, device jumpers, installation of cranes 3000,0 PC.
14 Installation of electric water-heating appliances PCs 1200,0
15 Installation of the siphon of the shell pieces 120,0
16 the Piping of the bath (setting the "overflow drain") to 350.0 PC.
17 Installation of shut-off valve, strainer pieces of 300.0
18 the meter Installation water meter EA. 1000,0
19 Installation of the reducer pieces 800,0
20 Mounting of manifold (complete) pieces 1600,0
21 Chasing channel for routing of pipes (concrete wall + 50%) MP. 400,0
22 Installation of fans, tube, MP. 250,0
23 Mounting the heater on a ready-made carts PCs 1200,0
24 Connection washing, dishwashers PCs 1100,0
25 Installation of water pipes MP. 300,0
26 Painting of steel radiator (1 section) 80,0 PCs.
27 Painting a cast iron radiator (1 section) 100,0 PCs.
28 the dismantling of the radiator 2500,0 PC.
29 Installation of the filter of thin cleaning with flushing PCs 1000,0
30 Installing water filters coarse pieces 500,0
Electrician.
1 electric meter Installation pieces 1500,0
2 installation of the machine PC. 250,0
3 Installation of outlet, switch (without shtrobleniya) mechanism and carton PCs 250,0
4 making the socket under the light switch, receptacle (concrete wall) to 350.0 PC.
5 making the socket under the light switch, Roz. (in the brick/penobloki the wall) 200,0 PCs.
6 the Making of the canal to cable wiring (concrete wall), MP. 300,0
7 the Making of the canal to cable wiring (in the brick/penobloki the wall), MP. 250,0
8 Wiring cable MP. 70,0
9 cable Wiring in the corrugation (including the feeding of the cable into the corrugation) MP. 100,0
10 lamp Installation pieces 250,0
11 the installation of the transformer (lighting) units 250,0
12 Installation and connection of the chandelier pieces 850,0
13 installing the batch file, ouzo PCs 700,0
14 electrical installation 2500,0 PC.
15 Fan (installation in hood, connection) PCs 400,0
16 Installing call PC. 250,0
17 junction box Installation pieces 250,0
18 the Device of warm floors 800,0 m2
19 Sealing grooves MP. 70,0
20 Drilling holes in the GCR PCs 50,0
21 Drilling holes in the roof rack pieces 100,0
Loading-unloading
1 Unloading of materials, lifting to the floor (by lift) tons. 2000,0
2 Removal of debris, loading in container tons. 2000,0
STRENGTHENING OF REINFORCED CONCRETE STRUCTURES
№ p/p the name of the work Unit. izm. The cost of the work
Grinding and dedusting of the surface
Leveling, filling holes, cavities and voids repair composition , the device of the fillets.
The primer
The application of epoxy glue
Installation of carbon fiber fabric m2 1700,0