1. The preparation of internal and external gas supply networks and their structures:
-consultation on questions of gasification with departure to the object (without payment),
-assistance in obtaining technical conditions for connection
-preparation of projects of gas supply systems,
-coordination of projects gazoraspredeleniya organization
-assisting owners of objects of public utility in obtaining limits on the gas
-production of calculations of consumption of gas as fuel for municipal and domestic use.
2.Check ventilation and flues with the results of the act of technical condition.
3.Installation of gas pipelines of any complexity:
device and the dismantling of internal gas supply systems
-construction of gas supply systems up to 1.2 MPa,
-perform insulation work,
-making holes in the walls and ceilings of buildings,
-purchase and delivery of materials and equipment to the object of gasification,
-Assembly and disassembly of hydraulic fracturing (gas distribution point),
-installation of equipment in boiler rooms,
-preparation of Executive-production of technical documentation,
-control of test systems and the delivery of the object of the Commission,
delivery representative operational organization, laboratory, and technical oversight for completion.
4.The provision of services for repair and maintenance of boilers:
-commissioning of boiler and auxiliary equipment
-providing services on repair of domestic boilers.