Our company uses for the construction of whole logs of pine-trees up to 12 metres, with a diameter of 400 mm. the Debarking of logs is made by special technology, high-pressure apparatus. The result is a protected layer remains intact. And the log becomes smooth and white. Technology is the manufacture of frames, applied in our company meets international standards of production of log houses, baths, arbors, etc. This technology allows to achieve the highest level of quality, strength, thermal insulation of buildings.
Cottage village "Chrysolite" occupies 44 hectares near the village of Rassokha. In the area of 334-sections 10-12 land "acres" is a lake that covers an area of 800 m2, with children‘s and sports grounds for recreation. Placed near the administration building, guard post and retail outlets, the range of which can be supplemented with a visit to the Rassokha three grocery stores and building materials market.
Yekaterinburg of the village is 33 km by highway (post office building), has a convenient transportation. Railway station "Chrysotile" is the distance from the plots 700 meters, so their residents do not hear the noise of the trains, and the journey to the city by train is just 15 min. by Bus to the village of rossokha can be reached in 40 min.
The cost of one hundred square meters of land from 42,000 rubles.
Construction firm, limited liability company "BUILDING the FUTURE"
Slave. tel: +7343 3282624
2.The Name of the leaders of the organization of their office
Director Polovinkin Ilya
GL. engineer serfs Peter E.
Zam. Director Delichev Ivan Vyacheslavovich
Com. Director Zastavkin Ivan Vladimirovich
3.Structureonly
On behalf of the society all economic, industrial and financial
operated by a – according to the Charter,
Director Polovinkin Ilya
Graduated from the Rostov State Construction University, Department of "Safety of technological processes and production – Ptpip". Experience in construction for 15 years.
For the successful implementation of operational plans the Director has
the following structural units:
a) Deputy Director
b) the existing construction areas and objects
C) chief engineer and his Department
g) the production and technical Department
d) estimate and contract Department
e) the supply Department and management
g) the Department of capital construction
h) accounting
I) the lawyer
K) specialist HR and employment law
4. The main activities of the organization
Production activities of "BUILDING the FUTURE" is carried out in accordance
with the Memorandum of Association, Charter of the Civil code of the Russian Federation,
Federal law.
Principal activities:
-capital construction of objects of industrial and civil purposes
turnkey
-reconstruction and capital repairs of buildings and structures for industrial,
civil and special purpose;
all types of earthworks (dams, embankments, dredging)
-improvement works;
-the functions of "Customer", "Contractor" and the implementation
supervision over construction;
-manufacture of separate kinds of building materials and structures.
All of these types of work the company has a license.
- Has its own production of air ducts, elbows, etc. (ventilation)
5. Information on the work performed
1. The construction of a grocery store chain "Magnit", Revda, ZAO "Tandem".
2. Finishing, plumbing and electrical work in the SEC "FANFAN"
3. Finishing, plumbing and electrical work in hotel "Agat", SP Karpuhin, Andrey Rudolfovich,
4. Construction of houses in the cottage village "Palniks"
5. Construction of houses in the cottage village Youth
6. The works were produced on the streets of Futchika 3 houses 16 storeys, developer of "Alliance group"
7. The General contractor ZHSK "Western"
VVK, OOO to cope with all the assumed
obligations is on the rise its production capacity.
Claims through the court of Arbitration on "BUILDING the FUTURE" will be charged.