The boiler plant produces hot water and steam boilers, furnaces, gas, diesel and fuel oil boilers, modular boiler mku, fuel supply systems and slag removal, cyclones, draft machines and water treatment systems.
- modular boiler mku
- boilers on gas, on coal, on firewood, on the diesel, on fuel oil, with a productivity of 300 - 1000 kg/h, CP-300, CP-500, CP-700, CP-1000
- hot water boilers KV to 4.0 MW. Boiler KV 0,15, 0,2 KV, KV 0,3, 0,4 KV, 0,5 KV, KV 0,6 KV 0,8 KV 1,0 KV 1,1 KV 1,25 KV 1,4 KV 1,6, KV 2,0 KV 3,5 KV 4,0.
- boilers on gas, on diesel, on fuel oil – from 0.4 to 4.0 MW
- boilers on wood from 170 kW to 1.0 MW
- furnace TSPM, TSPM-0,8, TSPM-1,45, TSPM-1,5, TSPM-2,0, TSPM-2,5, spare parts and grate TSPM, spare parts of boiler Bratsk
- furnace TLPKH, spare parts and grate TLPKH
- furnace TLSM spare parts and grate TLPKH
- furnace TCSM, spare parts and grate TCSM
- the mechanical Stoker ZP-400, ZP-600, DMC-400, PMZ-600. The spare parts of the Stoker.
- battery cyclones BC 2
- battery cyclones BC-259
- battery cyclones BC-512
- TSN 15 cyclones, TSN-15-300, TSN-15-400, TSN-15-500, TSN-15-600, TSN-15-700, TSN-15-800, TSN-15-900
- the cyclones TSN-11, TSN-11-300, TSN-11-400, TSN-11-500, TSN-11-600, TSN-11-700, TSN-11-800, TSN-11-900
- ash collectors ZU-1-1, ZU-1-2, ZU-1, ZU-2, ZU-2-1, ZU-2-2
housing element cyclone BC 2, BC exhaust pipe 2, element cyclone BC 259
- DN, DN 3,5, 6,3 days, 8 days, 9 days, 10 days, and 11.2 days, and 12.5 days
- the US fuel supply, ash removal, ash and slag removal USSH, conveyors TS-2-30 and TS-2-28
crusher TO-1M, VDP-15
- skip hoists boilers
- cast iron grate, furnace doors
- boiler automation, automation of boilers, automation of furnaces, automation of steam boilers
- the pipe system boilers: KVTS 20, KE, DE , DKVR
The company "Zhylu - XXI" specializiruetsya in the installation, commissioning, maintenance and repair of wide range of equipment, heating systems, boilers and boiler equipment. Our services will be of interest to both individuals and legal entities having in operation heating and hot water equipment from simple water heaters and wall-hung gas boilers to high-performance industrial boilers for heating installed from apartments and private houses, country cottages and buildings public utility to commercial real estate and industrial facilities.
Installation, reconstruction, modernization and repair of steam boilers at high, middle pressure and hot water boilers;
Installation, fabrication of the heat of pipelines, CHP plants, boiler houses;
Fabrication and erection of heating surfaces of boiler units