Energy To. Astana, Kazakhstan


Views: 62

The boiler plant produces hot water and steam boilers, furnaces, gas, diesel and fuel oil boilers, modular boiler mku, fuel supply systems and slag removal, cyclones, draft machines and water treatment systems.
- modular boiler mku
- boilers on gas, on coal, on firewood, on the diesel, on fuel oil, with a productivity of 300 - 1000 kg/h, CP-300, CP-500, CP-700, CP-1000
- hot water boilers KV to 4.0 MW. Boiler KV 0,15, 0,2 KV, KV 0,3, 0,4 KV, 0,5 KV, KV 0,6 KV 0,8 KV 1,0 KV 1,1 KV 1,25 KV 1,4 KV 1,6, KV 2,0 KV 3,5 KV 4,0.
- boilers on gas, on diesel, on fuel oil – from 0.4 to 4.0 MW
- boilers on wood from 170 kW to 1.0 MW
- furnace TSPM, TSPM-0,8, TSPM-1,45, TSPM-1,5, TSPM-2,0, TSPM-2,5, spare parts and grate TSPM, spare parts of boiler Bratsk
- furnace TLPKH, spare parts and grate TLPKH
- furnace TLSM spare parts and grate TLPKH
- furnace TCSM, spare parts and grate TCSM
- the mechanical Stoker ZP-400, ZP-600, DMC-400, PMZ-600. The spare parts of the Stoker.
- battery cyclones BC 2
- battery cyclones BC-259
- battery cyclones BC-512
- TSN 15 cyclones, TSN-15-300, TSN-15-400, TSN-15-500, TSN-15-600, TSN-15-700, TSN-15-800, TSN-15-900
- the cyclones TSN-11, TSN-11-300, TSN-11-400, TSN-11-500, TSN-11-600, TSN-11-700, TSN-11-800, TSN-11-900
- ash collectors ZU-1-1, ZU-1-2, ZU-1, ZU-2, ZU-2-1, ZU-2-2
housing element cyclone BC 2, BC exhaust pipe 2, element cyclone BC 259
- DN, DN 3,5, 6,3 days, 8 days, 9 days, 10 days, and 11.2 days, and 12.5 days
- the US fuel supply, ash removal, ash and slag removal USSH, conveyors TS-2-30 and TS-2-28
crusher TO-1M, VDP-15
- skip hoists boilers
- cast iron grate, furnace doors
- boiler automation, automation of boilers, automation of furnaces, automation of steam boilers
- the pipe system boilers: KVTS 20, KE, DE , DKVR



Address:

Kazakhstan
The Capital Of The Republic Of Kazakhstan
Astana city

str. Kayrata Rysulbekova, 4/2

tel. +7 (7172) 72-70-96


http://www.kotel-kv.kz
Actual on 01.01.2018
Project SPRAVKA109.RU © 2024